Hacker News new | past | comments | ask | show | jobs | submit
From Australlian ABC news...

The cost of the Snowy 2.0 pumped-hydro project is estimated to range from \(\$12\) billion to as high as \(\$42\) billion depending on the scope of costs included (such as direct construction, interest, and broader transmission). Originally announced in 2017 with a $2 billion price tag, the project has faced massive scale and logistical blowouts. The cost of the Snowy 2.0 pumped-hydro project is estimated to range from $12 billion to as high as $42 billion depending on the scope of costs included (such as direct construction, interest, and broader transmission).

That said , hydro systems have a LONG LIFESPAN - 100 YEARS ?

Batteries need to be replaced every X years.

So the ecomiomics of the comparisoan would need to be calculated ...

loading story #48906495
Dinorwig[1] was opened in 1984, and is looking at a £1B refurbishment shortly for “at least another 25 years” lifespan.[2]

[1] https://en.wikipedia.org/wiki/Dinorwig_Power_Station

[2] https://www.waterpowermagazine.com/analysis/re-planting-the-...