> [Fukushima] No small alignment of circumstances needed.
The tsunami is what initiated the accident, but the consequences were so severe precisely because of decades of bad decisions, many of which would have been assumed to be minor decisions at the time they were made. E.g.
- The design earthquake and tsunami threat
- Not reassessing the design earthquake and tsunami threat in light of experience
- At a national level, not identifying that different plants were being built to different design tsunami threats (an otherwise similar plant avoid damage by virtue of its taller seawall)
- At a national level, having too much trust in nuclear power industry companies, and not reconsidering that confidence after a number of serious incidents
- Design locations of emergency equipment in the plant complex (e.g. putting pumps and generators needed for emergency cooling in areas that would flood)
- Not reassessing the locations and types of emergency equipment in the plant (i.e. identifying that a flood of the complex could disable emergency cooling systems)
- At a company and national level, not having emergency plans to provide backup power and cooling flow to a damaged power plant
- At a company and national level, not having a clear hierarchy of control and objective during serious emergencies (e.g. not making/being able to make the prompt decision to start emergency cooling with sea water)
Many or all of these failures were necessary in combination for the accident to become the disaster it was. Remove just a few of those failures and the accident is prevented entirely (e.g. a taller seawall is built or retrofitted) or greatly reduced (e.g. the plant is still rendered inoperable but without multiple meltdowns and with minimal radioactive release).